The construction project on adding a ramp at Wanhua Huazhong Bridge, connecting to Shuiyuan Expressway

Considering the impact on roads, water resources related regulations, and traffics, the project will add additional ramps at the east of the Fumin evacuation gate, and the hydraulics analysis report was evaluated by the City’s water resources unit to be feasible. The project added a 778- meter long car ramp to connect the Shuiyuan Expressway, reconstructed the 382-meter long ramp outside of the dike, and renovated the 268-meter long motorcycle lane.