﻿<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" d1p1:xsi="http://www.gov.tw/schema/RSS20.xsd" xmlns:d1p1="schemaLocation"><channel><title>New Construction OfficeFAQ</title><link>https://english.nco.gov.taipei/News.aspx?n=FCD13515ACC3E7AD&amp;sms=5B794C46F3CDE718</link><language>en</language><copyright>New Construction Office</copyright><item><title><![CDATA[How to apply for adoption for public sidewalks?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=09739DAD814E2D2B</link><description><![CDATA[<p id="isPasted">The applicant should file a written application form with planning and design drawings which including the construction license, applied location map, applied area chart, pavement material and collage pattern, pavement detail drawing, street furniture setup diagram, traffic flow planning, drainage facility planning, C.C. box drawing, etc., when applying for adoption for public sidewalks to New Construction Office.&nbsp;</p>]]></description><pubDate>Thu, 16 May 2024 02:02:00 GMT</pubDate></item><item><title><![CDATA[What are the qualifications required for application specified in “the Regulations for Management of Open-Air Cafe Installations in Taipei City”?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=B89B539B1D8E09EC</link><description><![CDATA[<ol id="isPasted"><li>According to Article 3 of &quot;the Regulations for Management of Open-Air Cafe Installations in Taipei City&quot;, the scope of application of this Regulation is limited to the public sidewalks of urban roads or the pedestrian zones in Taipei City. Nevertheless, the adjacent bases that are residential areas are not within the scope of application.</li><li>Any catering business holding the company registration or business registration that prepares the sufficient relevant documents could apply to New Construction Office. The applicant can be issued with the permit which reviewed and approved after paid relevant fees such as usage fee and deposit.</li></ol>]]></description><pubDate>Thu, 16 May 2024 01:35:00 GMT</pubDate></item><item><title><![CDATA[What are the relevant fees to be paid when the applicant installs an open-air cafe on a sidewalk in Taipei City, and how to calculate them?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=EC1B2BEEF770D1E3</link><description><![CDATA[<p>1. The monthly usage fee within usage times according to regulations calculate by multiplying permitted areas, 1/12 of the announced land values per square meter, and 5% as annual interest.</p><p>*For example: Assuming that the announced land values in the current year is NT$76,576 per square meter, the monthly usage fee and deposit of an applicant with applied area of 30m<sup>2</sup> and daily business time from 7:00 am to 00:00 am is calculated as follows:</p><p>*Monthly usage fee = 30m<sup>2</sup> &times; NT$76,576/m<sup>2</sup> &times; 5% &times; 1/12 = NT$9,572</p><p>*Deposit = NT$9,572 &times; 2 = NT$19,144</p><p>2. The monthly usage fee within usage times according to provisos calculate by multiplying permitted areas, 1/12 of the announced land values per square meter, applied usage time ratio, and 5% as annual interest.</p><p>*For example: Assuming that the announced land values in the current year is NT$76,576 per square meter, the monthly usage fee and deposit of an applicant with applied area of 30m<sup>2</sup> and daily business time from 12:00 pm to 00:00 am is calculated as follows:</p><p>*Monthly usage fee = 30m<sup>2</sup> &times; NT$76,576/m<sup>2</sup> &times; (12hr/17hr) &times; 5% &times; 1/12 = NT$6,757</p><p>*Deposit = NT$6,757 &times; 2 = NT$13,514</p><p>If the permitted usage time is less than one month, the usage fee should be calculated based on the period of one month.</p><p>If the permitted usage time is less than three months, all the usage fee shall be paid in full before used; for those over three months, the usage fee every instalment should be paid in full before the start of each instalment, and regarded three months as one instalment.</p>]]></description><pubDate>Thu, 16 May 2024 01:06:00 GMT</pubDate></item><item><title><![CDATA[Why don&apos;t all the arcade buildings with different height set to the same level?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=B627A0C60AAE0422</link><description><![CDATA[<p>For leveling of arcade buildings (including the surface of streets along the construction site, where the pedestrians can pass through), because they are private properties, permission from the owners shall be obtained, in addition, one complete block shall be deemed as a basic unit for leveling, therefore, not all the arcade buildings having height difference can be improved through leveling. Additionally, if there are significant height differences or structural issues that cannot be rectified, connecting or appropriate alternative solutions will be adopted to improve the situation.</p>]]></description><pubDate>Thu, 16 May 2024 01:00:00 GMT</pubDate></item><item><title><![CDATA[What are the regulations of the facilities near open-air cafes within the range of license permission?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=3B3A396642EA41C4</link><description><![CDATA[<p>Upon approval by New Construction Office, ambient landscape facilities such as movable potted plants with height no more than 120cm can be placed provided such facilities cause no pedestrian obstructing traffics and with appropriate safety measures. During non-business hours, all such facilities should be moved away to restore the pedestrian space.</p><p><br></p><p align="center"><br></p>]]></description><pubDate>Thu, 16 May 2024 01:00:00 GMT</pubDate></item><item><title><![CDATA[Where the applicant cannot install open-air cafes?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=D269FAF3B78C7096</link><description><![CDATA[<ol id="isPasted"><li>No&nbsp;open-air cafes&nbsp;can be installed at any place which adjoin a residential area.</li><li>No&nbsp;open-air cafes&nbsp;can be installed within 10m of any corner, bus stop, and entry/exit of MRT station, and within 3m of any entry/exit of underground mall, underpass, and footbridge.&nbsp;Nevertheless, which can be applied&nbsp;if it has been agreed to reduce the off-limits by the units/departments concerned after investigating the local situation.</li><li>No open-air cafes can be installed on any planting pattern, facilities area, bicycle path, motorcycle parking lot and crosswalk conner. Nevertheless, which can be applied if it has been agreed by the units/departments concerned after investigation.</li></ol>]]></description><pubDate>Thu, 16 May 2024 01:00:00 GMT</pubDate></item><item><title><![CDATA[What is the contract duration of the usage license for installing open-air cafes?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=00B7A5E262C1AB79</link><description><![CDATA[<p>The contract duration of the usage license should not exceed three years each time. The applicant can apply for extension of the license to New Construction Office for extension within 3 months before the expiration.</p>]]></description><pubDate>Thu, 16 May 2024 01:00:00 GMT</pubDate></item><item><title><![CDATA[What is the required passage space for pedestrians when open-air cafes are installed on a sidewalk?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=7382A471438C7D80</link><description><![CDATA[<ol class="decimal_type" id="isPasted"><li>For sidewalks without porch, the clear width should be at least 2.5 m after installing the open-air cafes.<br>&nbsp;(Clear Width, Allowed Width for Use)</li><li>For sidewalks with porch with ground columns, the clear width should be at least 2.0 m excluded the width of the porch after installing the open-air cafes.<br>&nbsp;(Porch)</li><li>For sidewalks with porch without ground columns, the clear width should be at least 1.5 m excluded the width of the porch after installing the open-air cafes.</li></ol><p><br></p>]]></description><pubDate>Thu, 16 May 2024 01:00:00 GMT</pubDate></item><item><title><![CDATA[How do we apply for leveling the arcade in front of our buildings?  How does the process work?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=2F6328367D0C9D2A</link><description><![CDATA[<p>For suggestions to arcade renovation sections (including the surface of streets along the construction site, where the pedestrians can pass through) of Taipei City, please contact the Construction Management Office (TEL: 02-2725-2738). When making a suggestion, please specify the address of the arcade. Upon acceptance of your suggestions, the Construction Management Office will designate personnel to carry out a survey, ensuring the site comply with key conditions of this project (gaps in height and maintenance of the street look). If the site complies with the said conditions, the Construction Management Office will invite borough chief to confirm the willingness of shop owners of that section for relevant evaluation.</p>]]></description><pubDate>Wed, 21 Jun 2023 02:17:00 GMT</pubDate></item><item><title><![CDATA[What are the stipulations governing the reduction and exemption of the fee-charging for usage of urban road?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=088FEA74CCC55E73</link><description><![CDATA[The user fee can be reduced for wiring or facilities that meet the requirements of the following subparagraphs: 1. When the pipelines or facilities originally installed at the road section require to be relocated due to the needs of any urban road project, the user shall cooperate with the completion of the relocation as scheduled. From the year in which the road project is completed, the collection of fees will be reduced by half for a period of 3 consecutive years. 2. From the implementation of the Fee-Charging Standards for Usage of Urban Roads, the user of the urban road will take the initiative to place the wiring underground, and within 3 years, if such user has not been punished by Article 33 of the Urban Road Act for 3 times or more, from the year of completion, 75% of the fees of the wiring underground will be reduced for a period of 2 years. 3. A 75% reduction in the fees for utility poles or telecommunication poles that also serve as lighting poles or installed with public surveillance system.]]></description><pubDate>Fri, 10 Jun 2022 07:11:00 GMT</pubDate></item><item><title><![CDATA[What is the timing for collection of charge on use of urban roads?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=2F2FB3B1B735C67E</link><description><![CDATA[Any user who uses the ductworks or facilities provided on, above or under the urban road land shall apply to DNC for the quantity, period of use and trial calculated due amount of the previous year before March 31 each year. DNC, after having received such an application, shall determine the amount due before May 31 and notify the user in written form to pay off before June 30.]]></description><pubDate>Fri, 10 Jun 2022 07:08:00 GMT</pubDate></item><item><title><![CDATA[What are the date of issuance and effective date of the charging standard on use of urban roads?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=CF72FB8583C4067D</link><description><![CDATA[&ldquo;The Charging Standard on Use of Urban Roads&rdquo; was issued as per Decree Wording Taineiyingtzi No. 0940082179 by the Ministry of Interior on March 25, 2005 and came into effect on January 1, 2005 as stipulated under Article 6 of this Standard.<br />All 6 articles were amended and promulgated as per the letter of Ministry of the Interior, no. Tai Nei Ying 0970804733, dated July 1 2008 and in effect immediately except for the amended table in Article 2, which was enforced on Jan 1 2008. Article 6 and the table in Article 2 were amended and promulgated as per the letter no. Tai Nei Ying 1010811762, dated December 26 2012, and the table of Article 2 was in effect on Jan 1 2012. Addendum for amendments to Article 6 and Article 2 based on Order Tai-Nei-Yin-Zi No. 1050803023 issued on 31 March 2016.<br />On September 8, 2021, the Ministry of the Interior issued the official letter Tai Nei Ying Zi No. 1100814252 to amend and promulgate all 6 articles and the appendix to Article 2; which shall come into force on January 1, 2021.]]></description><pubDate>Fri, 10 Jun 2022 07:03:00 GMT</pubDate></item><item><title><![CDATA[Who do I have to talk to when I found a damaged roadside ditch cover?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=AD4AB92A9D6E67CC</link><description><![CDATA[Please inform the New Construction Office to deal with side trench covers of the City’s roads.]]></description><pubDate>Wed, 20 Apr 2016 16:00:00 GMT</pubDate></item><item><title><![CDATA[What is the area for installing open-air cafes under “the Regulations for Management of Open-Air Cafe Installations in Taipei City”?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=FEA908F6997BDFB1</link><description><![CDATA[<p>For the catering business holding the company registration or business registration, the area for installing open-air cafes through the application is only limited to which adjacent the urban roads and perpendicular to the public sidewalks or the pedestrian zones of the extended road. Nevertheless, the adjacent bases that are residential areas are not within the scope of application.</p>]]></description><pubDate>Fri, 16 May 2014 01:00:00 GMT</pubDate></item><item><title><![CDATA[What is the competent authority of “the Regulations for Management of Open-Air Cafe Installations in Taipei City”?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=89749E5C01091080</link><description><![CDATA[<p>New Construction Office, Public Works Department, Taipei City Government takes the responsibility.</p>]]></description><pubDate>Fri, 16 May 2014 01:00:00 GMT</pubDate></item><item><title><![CDATA[How to apply for setting up an advertisement on pedestrian overpass?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=58C3DE8EBDC42DA3</link><description><![CDATA[Setting up an advertisement on pedestrian overpass in Taipei has been prohibited by Taipei City Government since May 17, 2013.]]></description><pubDate>Mon, 21 Apr 2014 16:00:00 GMT</pubDate></item><item><title><![CDATA[How should I apply for building advertising signs or banners on the pedestrian overpass ?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=706401785223705F</link><description><![CDATA[For landscaping, the Taipei City Government has not issued the said advertising signs and banners since May 17, 2013.]]></description><pubDate>Tue, 18 Jun 2013 16:00:00 GMT</pubDate></item><item><title><![CDATA[Which department is in charge of  the arcade leveling project?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=DEA93C502898A5F3</link><description><![CDATA[The assessment, planning and design of arcade renovation sections (including the surface of streets along the construction site, where the pedestrians can pass through) of Taipei City is handled by Taipei City Construction Management Office, and the construction is in charge by New Construction Office, Public Works Department, Taipei City Government.<br />&nbsp;]]></description><pubDate>Mon, 22 Apr 2013 16:00:00 GMT</pubDate></item><item><title><![CDATA[After the roads are developed at the owners’ expenses, who will take over the maintenance works therefor and what are right rights and interests of private and’s owner?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=D8FA635C925EDA58</link><description><![CDATA[<p style="margin: 0cm 0cm 0pt;">Regarding the development of urban roads in public lands of Taipei City at the one&rsquo;s own expenses, it is a must to, upon the completion of construction, report to the New Construction Office to conduct an approval survey together with Parks and Street Lights Office, Hydraulic Engineering Office, Traffic Engineering Office and Department of Environmental Protection before New Construction Office taking the site over for the following management and maintenance works. Where the construction is related to private lands, it shall be managed and handled by the Construction Management Office in accordance with &ldquo;Regulations Governing the Application of Construction License for Construction Site Access Roads of Unfinished Public Facilities of Taipei City&rdquo; and, upon completion of the construction, the road facilities shall still be managed and maintained by Taipei City Government relevant units. Besides, the Construction Management Office shall demand the builder to declare that, if the completed roads must be redeveloped due to public uses or construction of public facilities by the government, it will not request to make compensation thereof. The Letter of Declaration shall be submitted to the Construction Management Office and be preserved with the construction license. If there is any question, please contact the Planning and Design Section of New Construction Office (TEL: 1999, (or 02-27208889 for areas outside the Taipei City) Ext. 7958) for detailed explanations.</p>&nbsp;<p>&nbsp;</p>]]></description><pubDate>Tue, 12 Apr 2011 16:00:00 GMT</pubDate></item><item><title><![CDATA[How to plan, design and construct the road alignment under Taipei Urban Plan? What is the operation process flow?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=303C6550E1A59B15</link><description><![CDATA[For a road under the urban plan of Taipei City, the Department of Urban Development of our government will include in its plan, set the road elevations and make notice to the public, then, the Department of Transportation will provide the relevant drawings (including width of sidewalk) regarding road type planning for New Construction Office, Public Works Department, Taipei City Government to include it in the project design needs and discuss the design matters, then handle construction contracting upon completion of design.<br />&nbsp;]]></description><pubDate>Sun, 25 Apr 2010 16:00:00 GMT</pubDate></item><item><title><![CDATA[Will business of the shops be affected during leveling of arcade buildings?]]></title><link>https://english.nco.gov.taipei/News_Content.aspx?n=FCD13515ACC3E7AD&amp;s=F7BAC318F050CB2E</link><description><![CDATA[Construction period for leveling of arcade buildings depends on the conditions at the site, generally, it will take about 10 days to complete leveling for one block (about 100 meters). Furthermore, in order to minimize impact and construction period, principly, &ldquo;one block&rdquo; is regarded as one construction unit. During the construction, temporary pedestrian mats shall be installed for residents and users to access the area. Apart from the construction of pavement removal, which is about 1 to 2 days in the early period, the residents are unlikely to be affected thereby.]]></description><pubDate>Sun, 25 Apr 2010 16:00:00 GMT</pubDate></item></channel></rss>
